Project - K2RQ (Kingsrove to Reevsby Quadruplication)K2RQ - RAIL CORRIDOR SHORING WITH SOIL NAILS & SHOTCRETE Project: Kingsgrove to Revesby Rail Quadruplication
Client: RailCorp
Principle Contractor: K2RQ Alliance
Total metres drilling: 7,500
Total number of soil nails: In excess of 1,500
Design Types: Soil nails with double corrosion protection
Anticipated completion: March 2010
![]() The RIX Group are demonstrating our expertise and capabilities at K2RQ, embracing the challenges of working within the rail corridor to deliver superior work to RTA Quality Assurance Specifications R64 and R68 in areas typically with limited access and at heights up to 12m.
![]() By utilising our highly trained and professional in-house site teams and purpose designed drills rigs, grout stations and shotcrete rigs, The RIX Group are delivering 10,000m2 of shotcrete walls including 7500m of permanent soil nails to the K2RQ project.
|
|